The builder is the one who buys, orders and pays for the construction. He may or may not use it after completion. However, it can also be paid for by an investor (eg a bank or other source).
At this stage, visualization and studies are important, the technical aspects of the building are not addressed, but rather the design, dimensions, use. This is a job for an architect.
The builder is the one who buys, orders and pays for the construction. He may or may not use it after completion. However, it can also be paid for by an investor (eg a bank or other source).
At this stage, visualization and studies are important, the technical aspects of the building are not addressed, but rather the design, dimensions, use. This is a job for an architect.
The builder and other persons authorized by him at this stage supervise the design work, commenting on them so that the resulting construction meets the purpose.
Its main activity is to ensure the accuracy and completeness of the BIM model. This position coordinates the individual participants (BIM modelers / designers). It can perform, for example, collision detection or other analyzes. The project documentation is primarily on the supplier's side, but it can also be on the construction contractor's or builder's side. It can set up its own CDE or take over the client's CDE (better option).
Its job is to implement and maintain BIM in the organization. He should be able to set up processes and software tools (CDE, CAFM, GIS, etc.) for the operation of live BIM. In cooperation with the supplier of design documentation, resp. The BIM coordinator sets up the solution so that it corresponds to the already established principles in the organization. E.g. correctly applied data standard or classification system. The BIM manager must have an up-to-date overview of BIM's global innovation in order to deliver these solutions to the organization.
Creation of a project according to the Decree of the Building Law No. 499/2006 on construction documentation. Ideally, as a 3D building model with data, a classification system and a prepared data standard.
The builder and other persons authorized by him at this stage supervise the design work, commenting on them so that the resulting construction meets the purpose.
Its main activity is to ensure the accuracy and completeness of the BIM model. This position coordinates the individual participants (BIM modelers / designers). It can perform, for example, collision detection or other analyzes. The project documentation is primarily on the supplier's side, but it can also be on the construction contractor's or builder's side. It can set up its own CDE or take over the client's CDE (better option).
Its job is to implement and maintain BIM in the organization. He should be able to set up processes and software tools (CDE, CAFM, GIS, etc.) for the operation of live BIM. In cooperation with the supplier of design documentation, resp. The BIM coordinator sets up the solution so that it corresponds to the already established principles in the organization. E.g. correctly applied data standard or classification system. The BIM manager must have an up-to-date overview of BIM's global innovation in order to deliver these solutions to the organization.
Creation of a project according to the Decree of the Building Law No. 499/2006 on construction documentation. Ideally, as a 3D building model with data, a classification system and a prepared data standard.
The builder and other persons authorized by him (such as TDS or BIM Manager) control the progress of the implementation.
And other subcontractors are building. Ideally, in agreement with the designer, they pass on the implementation process to him, which forms the BIM model of the actual design. The construction can be carried out using the BIM method and tools.
Certainly it will be the technical supervision of the builder (or TDI - technical supervision of the investor, but TDS is legally correct) and the author's supervision (designer). Another person guarding the construction site is the safety and health coordinator at work on the construction site. Or the supervision of the building authority may appear here.
The project manager is responsible for the entire management system, communication, coordination and control during construction. It can also be referred to abroad as the Commissioner:
that is, the person primarily responsible for the transfer of BIM data to administration and operation.
The builder and other persons authorized by him (such as TDS or BIM Manager) control the progress of the implementation.
And other subcontractors are building. Ideally, in agreement with the designer, they pass on the implementation process to him, which forms the BIM model of the actual design. The construction can be carried out using the BIM method and tools.
Certainly it will be the technical supervision of the builder (or TDI - technical supervision of the investor, but TDS is legally correct) and the author's supervision (designer). Another person guarding the construction site is the safety and health coordinator at work on the construction site. Or the supervision of the building authority may appear here.
The project manager is responsible for the entire management system, communication, coordination and control during construction. It can also be referred to abroad as the Commissioner:
that is, the person primarily responsible for the transfer of BIM data to administration and operation.
More than a site manager. It is the leader in the longest phase of LCC. He should be an innovative and progressive person with managerial skills. He leads a team of people who take care of the correct and trouble-free operation of the construction. Today, this management also includes property, asset, risk or change management.
Regular inspections and checks or ongoing servicing are a common part of building operations. Maintenance must be divided into reactive, predictive and preventive. Depending on the problem or situation, regular activities can be easily planned or reactive events can be dealt with effectively using the CAFM system and BIM.
Guard service, receptions, patrols, but also health and safety and other partial FM processes are an essential part of the operation and running of the construction. Whether it is the protection of health and persons (building users) or property. This is also related to key management and again the link to CAFM and BIM software.
Cleaning is the most common building activity. Based on BIM data, we know the exact areas of floors, their surfaces, areas of windows or window sills. The CAFM system plans an efficient cleaning or a basis for selecting a cleaning supplier. With the help of SLA (KPI) it is possible to monitor and evaluate the quality of the performed cleaning. Everything fits into BIM and operational and maintenance efficiency.
More than a site manager. It is the leader in the longest phase of LCC. He should be an innovative and progressive person with managerial skills. He leads a team of people who take care of the correct and trouble-free operation of the construction. Today, this management also includes property, asset, risk or change management.
Regular inspections and checks or ongoing servicing are a common part of building operations. Maintenance must be divided into reactive, predictive and preventive. Depending on the problem or situation, regular activities can be easily planned or reactive events can be dealt with effectively using the CAFM system and BIM.
Guard service, receptions, patrols, but also health and safety and other partial FM processes are an essential part of the operation and running of the construction. Whether it is the protection of health and persons (building users) or property. This is also related to key management and again the link to CAFM and BIM software.
Cleaning is the most common building activity. Based on BIM data, we know the exact areas of floors, their surfaces, areas of windows or window sills. The CAFM system plans an efficient cleaning or a basis for selecting a cleaning supplier. With the help of SLA (KPI) it is possible to monitor and evaluate the quality of the performed cleaning. Everything fits into BIM and operational and maintenance efficiency.
The builder, together with the facility manager, kept the building in operation during its lifetime. However, when the time comes to decide what to do next, they are the ones who will make the decisions. They need relevant data to do this, and if there is a digital twin building - an updated BIM model, this is the basis for the right decisions.
Creates documentation of demolition work. If it can be based on current documentation maintained in digital form, it will have a very simplified work. In the case of renovation, it designs the reconstruction or modernization of the building. Again, it can be based on the current BIM model.
A company that liquidates a building or carries out renovations. In the case of disposal, the current documentation and the BIM model can define risk areas, materials, logistics for waste collection, etc.
The builder, together with the facility manager, kept the building in operation during its lifetime. However, when the time comes to decide what to do next, they are the ones who will make the decisions. They need relevant data to do this, and if there is a digital twin building - an updated BIM model, this is the basis for the right decisions.
Creates documentation of demolition work. If it can be based on current documentation maintained in digital form, it will have a very simplified work. In the case of renovation, it designs the reconstruction or modernization of the building. Again, it can be based on the current BIM model.
A company that liquidates a building or carries out renovations. In the case of disposal, the current documentation and the BIM model can define risk areas, materials, logistics for waste collection, etc.